What is checked on a load line survey?

What is checked on a load line survey?

Check that all access openings at ends of enclosed structures are in good conditions. All dogs, clamps and hinges to be free and well greased. All gaskets and water-tight seals should be crack free. Ensure that the doors open from both sides. Check all cargo hatches and access to holds for weather tightness.

How do you load a line survey?

Mentioned below are some important points that needs to be considered while preparing for a load line survey:

  1. Check Access Points: Access points at enclosed structures should be checked.
  2. Check Ventilators and Air pipes: Ventilators and air pipes (openings) should be provided with closing mechanisms.

What is load line inspection?

An annual inspection is carried out to ensure that no altercations have been made to the hull or superstructure which may affect the calculations to determine the position of load lines and that fittings and appliances have been maintained in an effective condition for: Protection of openings.

What are the points to consider before conducting a ship survey?

The vessel should be clean and free of personal items. Items blocking any hatches of panels need to be moved or removed to allow access. Vessel papers need to be on board such as Documentation, Registration etc.

How do I prepare for a safety construction survey?

Water-tight doors are in good condition. Remote and local controls working properly. Hatch Covers and Coamings examined for weather-tightness Satisfactory and operation of Hatch Covers should be carried out. Bilge pumping and drainage arrangements are in good condition & tried out.

What is assigned to a ship after initial load line survey?

These are the conditions which must be met before free board is assigned to a ship and load line certificate is issued following a load line survey. Free boards are computed assuming ship to be a completely enclosed and water tight / weather tight envelop.

How do you prepare a ship for a survey?

VESSEL SURVEY PREPARATION

  1. Making sure that the vessel is clean.
  2. Removing unnecessary items from the vessel, including personal effects and clutter.
  3. Having registration papers available for inspection.
  4. Checking all safety gear for compliance with Federal regulations, and updating if necessary.

What is the prep of survey?

Before starting survey work, authorization and scope of inspections are to be clarified, the necessary tools and personal equipment items to be prepared, and the safety precautions are to be arranged.

What is seq survey?

CARGO SHIP SAFETY EQUIPMENT CERTIFICATE. CARGO SHIP SAFETY EQUIPMENT CERTIFICATE SHALL BE ISSUED AFTER SURVEY TO A CARGO SHIP OF 500 GT. AND OVER WHICH COMPLIES WITH THE RELEVANT REQUIREMENTS OF CHAPTER II-1,II-2.AND III AND ANY OTHER RELEVANT REQUIREMENT SOLAS-74.

What is safety construction certificate?

A certificate called a Cargo Ship Safety Construction Certificate shall be issued after survey to a cargo ship of 500 gross tonnage and over which satisfies the requirements for cargo ships on survey, set out in regula-tion I/10 of SOLAS 1974, and complies with the applicable requirements of chapters II-1 and II-2.

How thick are the load lines mark?

Load Lines – Load lines are horizontal lines extending forward and aft from a vertical line placed at a distance of 540mm from the centre of the disc. They measure 230mm by 23mm. The upper surfaces of the load lines indicate the maximum depths to which the ships may be submerged in different seasons and circumstances.

How to prepare for load line/annual survey?

Class – Preparations for Load Line / Annual Survey: Ships officers / Engineers should ensure the following items are in efficient condition, prior to the classification surveyor’s arrival onboard: Load line marks, verified with existing load line certificate

Where can I find load line&safety construction surveys flashcards?

Study Load Line & Safety Construction Surveys flashcards from Fraser Gow’s class online, or in Brainscape’s iPhone or Android app. ✓ Learn faster with spaced repetition. Load Line & Safety Construction Surveys Flashcards by Fraser Gow | Brainscape

What is a load line annual inspection?

Load Line Annual Inspection carried out with 3 months +/- anniversary date of certificate. Main purpose of Load Line survey is to examine that’s the ship construction complies with requirements of the convention. 2#N#. Class – What is a notation of class?

What is the condition of assignment for LL survey?

When an initial LL Survey is complete the surveyor will draw up a “Condition of Assignment”, which shows every opening to the hull, how it closes, thickness of gaskets, height of coming to hatch, sounding cap, scupper. The condition of assignment will be asked for when a surveyor does an inspection. Decks in Master 3000 PrepClass (31):